| Project | Birmingham New Hospital Joint Venture | ![]() |
|
| Location | Birmingham | ||
| Main Contractor | Balfour Beatty |
||
| Consultant | Hulley and Kirkwood, Birmingham | ||
| M&E Contractor | Haden | ||
| Type | PFI Hospital | ||
| Year | 2007 | ||
Project OverviewThe Birmingham New Hospital Joint Venture project is one of the biggest PFI builds in Europe and 2nd only to St Bart’s in London. Engineering Appliances worked with consulting engineer Hulley and Kirkwood in Birmingham and the Haden Young contract team out of their Tamworth office to deliver high resilience solutions with the lowest life cycle costs. |
|||
Products Supplied by Engineering Appliances
|
|||
|
Pressurisation Equipment for Heating, Cooling and Secondary Circuits. For Precision pressure maintenance. Two separate Transfero TPV with integrated degassing and water make up functions have been linked and operate as Master and Slave to give a high resilience solution in a space saving format. Transfero is a spill type pressurisation system using pumps and spill valves to control system pressures to within very tight limits. The sealed vessels are pressure less and therefore require no future inspections Zeparo in line dirt separation units complete with magnet. The additional magnet dramatically improves the efficiency of dirt separators in chemically treated systems. The chilled water uses one of the largest units in the UK at DN500 13,000 high quality EPDM stainless steel braided hose connections to ceiling mounted radiant panels using Tectite push fit connections. The hoses are BSRIA tested and conform to the HMSA standard. |
.
|
|
|
Special RequirementsFor further information please contact steve.miller@engineering-appliances.com 07976 088914 |
|||